• Login
    • University Home
    • Library Home
    • Lib Catalogue
    • Advance Search
    View Item 
    •   KDU-Repository Home
    • INTERNATIONAL RESEARCH CONFERENCE ARTICLES (KDU IRC)
    • 2024 IRC Articles
    • Built Environment and Spatial Sciences
    • View Item
    •   KDU-Repository Home
    • INTERNATIONAL RESEARCH CONFERENCE ARTICLES (KDU IRC)
    • 2024 IRC Articles
    • Built Environment and Spatial Sciences
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Impact of Time, Cost, Quality Parameters on Value Engineering Application in Project Management Practices, Reference to Post-Contract Stage

    Thumbnail
    View/Open
    FBESS - 2.pdf (464.7Kb)
    Date
    2024-09
    Author
    Dodangoda, DVH
    Kawmudi, WN
    Metadata
    Show full item record
    Abstract
    The three basic objectives of a project are time, quality, and budget. Poor construction quality, delays in the completion of projects, and cost overruns continue to afflict Sri Lanka's construction industry. Poor management and cooperation both before and after the contract have a significant impact on these issues. Value engineering is one method that is used in many countries to lessen project management issues. The main objective of the research is to measure the impact of time, cost and quality on value engineering approaches in project management in the post-contract stage. The research study was enhanced by the exceptional representation of industry professionals, comprising 92.3% of a reply rate. The industry specialists made a variety of suggestions based on their experience with value engineering during the post-contract stage of a project. Methods of statistical analysis were used to review the collected data. The findings indicated that using the VE approach, the quality factor had an overall influence of 37.5%, the cost component had an impact of 3.9%, and the time factor had an impact of 39% on the range of effective project management techniques. The factors on time, cost, and quality in high-rise building projects at the post-contract stage were the primary focus of this study. Further research could be done to explore how the value engineering concept affects the project management methods applied in infrastructure projects in Sri Lanka.
    URI
    http://ir.kdu.ac.lk/handle/345/8409
    Collections
    • Built Environment and Spatial Sciences [32]

    Library copyright © 2017  General Sir John Kotelawala Defence University, Sri Lanka
    Contact Us | Send Feedback
     

     

    Browse

    All of KDU RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsFacultyDocument TypeThis CollectionBy Issue DateAuthorsTitlesSubjectsFacultyDocument Type

    My Account

    LoginRegister

    Library copyright © 2017  General Sir John Kotelawala Defence University, Sri Lanka
    Contact Us | Send Feedback