A Study on Workload of a Medical Linear Accelerator at a High Throughput Cancer Treatment Centre in Sri Lanka
View/ Open
Date
2023-11Author
Ramanathan, V
Gamage, SCSM
Jayarathna, LWMN
Metadata
Show full item recordAbstract
Radiotherapy bunker design depends on several factors, and among them, workload is one of the important factors.
Workload is calculated from the radiation dose delivered at the isocenter. Due to the introduction of new
radiotherapy treatment modalities and an increasing number of new cancer patients, there is a higher possibility to
increase the workload. Therefore, this study aims to assess the workload of Varian linear accelerator vault at
Apeksha Hospital, Maharagama. Data were collected from 1st of August 2020 to 30th November 2020. Dose
delivered at isocenter from the 3D-CRT procedures with 6 MV and 15 MV photon energy, the IMRT procedures
with 6 MV photon energy and the quality assurance (QA) procedures were collected from ARIA patient management
system and transferred into Excel spread sheet for data analysis. The calculated weekly workload was 2326 Gy/week
with a 43% contribution from the IMRT procedures with 6 MV, 39% contribution from the 3D-CDT procedures
with 6 MV, 16% contribution from the 3D-CDT procedures with 15 MV and 2% contribution from physics workload
(QA procedures). The evaluated workload is higher than the NCRP recommended workload of 1000 Gy/week. This
study recommends for at least a one-year survey for more accuracy on workload assessment, and also to evaluate
the use factor since most of the advanced radiotherapy treatment techniques use high number of monitor units which
will increase the leakage radiation.