    • Error Analysis for Volume Calculations Using Spot Reduced Levels 

      Karunaratne, HKK; Rathnayake, GC; Wanasinghe, GI; Senarathna, DR (2019)
      The volume calculation of soil to be excavated is important in construction projects for the cost estimation prior to the construction. Generally, it is carried through the spot heights, using a hypothetical grid ...
    • Modification for End Area Rule Used in Volume Calculation of Highway Pavements 

      Wanasinghe, GI; De Silva, HKNA; Thennakoon, PG; Kalugamuwa, KWGIM (2019)
      Volume calculation of earth work of road pavements is very important section in project cost estimation. Practically it is very difficult to calculate the actual volume of a pavement as the cross section varies by its ...
    • Volume Estimation for Highway Curves Using End-Area Rule 

      Wanasinghe, GI; Gimhani, KDM; Ranasinghe, ND; Udawatta, UGRL (2018)
      The volume calculation of road sub surface materials in highways is important in project cost estimation prior to the construction, and in investigations after the construction. Usually it is done with the linear measurements ...